Equipment

Current location:跳过导航链接Home > Manufacturing Process

Manufacturing Process

1. Raw Material (Billet) 2. Inspection for Raw Material 3. Raw Material Cutting 4. Surface Cleaning
5. Heating 6. Piercing 7. Pointing for Cold Drawing 8. Acid & Pre-treatment
9. Cold Drawing/Rolling
(Pilger Mill)
10. Dimension & Surface Inspection 11. Degreasing 12. Heat Treatment
13. Mechanical Test (Sample) 14. Straightening 15. NDT TEST 16. Cutting for both edges
17. Dimension & Surface Inspection 18. Anti Rust Process 19. Marking / Packing 20. Shipping

Jiangsu Jianzhong New Material Co.,Ltd © All Rights Reserved  Phone:+86 515 8981 0196 Fax:+86 515 8833 5552

Add:No.303 Baoping Lake Road, Environmental Protection Industry Park, Yancheng City  Technical support:Huaqilifang